Project Cargo & Charters · Air · Sea · Rail · Road

Engineered Moves for Cargo That Doesn’t Fit a Standard Box

CSI Trans plans and executes project logistics end to end — route and site surveys, lifting and lashing engineering, on-demand aircraft charters and blocked boards, breakbulk and heavy-lift ocean, over-dimension road and rail moves, and factory-to-factory plant relocations — with a named project desk on watch through to positioning.

OOG/HEAVY
Out-of-gauge & heavy-lift engineering
CHARTER
On-demand charters & blocked boards
BBK·RORO
Breakbulk, RoRo, flat-rack & open-top
PERMITS
Route surveys & over-dimension permits
Survey · lifting plan · charter desk · permits · customs · positioning support

Project Execution Process

Eight Steps from Survey to Positioning

Every heavy, long or urgent piece follows the same disciplined sequence — measured, calculated, permitted and supervised.

01

Cargo & Site Survey

Collect dimensions, weight and drawings, and inspect origin and destination site access, floors and lifting points.

02

Feasibility & Method Statement

Compare routes and modes, run lifting and lashing calculations, and issue a method statement with risk controls.

03

Booking & Charter Plan

Arrange the aircraft charter or blocked board, geared vessel, special rail wagon or specialized trailer plan.

04

Export Packing & Lashing

Case, crate and protect the cargo, then lash and chock it to the agreed securing plan.

05

Permits & Customs

Arrange over-dimension permits and export/import declarations, with DG paperwork where applicable.

06

Loading & Lift Supervision

Supervise weighing, loading and lifting, photo-record the stowage and sign off the securing check.

07

In-Transit Watch

Track position and transhipments, supervise handovers and arrange escorts where the route requires.

08

Delivery & Positioning

Receive on site, coordinate the local crane and rigging team, position the unit and return signed POD.

Export packing and container stuffing for project cargo
Nothing Moves Until the Math Is Signed Off 方案签字,货才上路

Engineering & Packing

Surveyed, Calculated and Lashed Before Anything Moves

  • Route & Site Survey

    Road widths, bridges, height and weight restrictions, and site access checked before routing.

  • Lifting & Lashing Calculations

    Weight distribution and securing forces calculated, with a written method statement issued.

  • Export Crating & Protection

    Wooden cases, skids, vacuum and moisture protection for long ocean voyages and outdoor storage.

  • Special-Equipment Stowage

    Flat-rack, open-top and platform stowage, plus tarpaulin protection for long, tall and wide pieces.

  • DG & Battery Cargo

    Dangerous goods and lithium batteries handled under IATA DGR and IMDG rules, subject to carrier and route confirmation.

Charter & Heavy-Lift Execution

When Scheduled Capacity Is Not Enough

Capabilities

Four Ways to Move the Hardest Cargo

The mode and equipment are chosen from the cargo drawing and the site — never the other way around.

AIR CHARTER

Air Charters & Emergency

  • Full and part charters arranged on demand
  • Blocked boards & extra sections
  • Over-size and heavy air pieces
  • AOG and emergency response desk
CORE · SEA

Breakbulk & Heavy-Lift Ocean

  • Breakbulk and project shipments
  • Geared vessels & heavy terminals
  • Flat-rack, open-top & platform
  • RoRo for rolling cargo
ROAD · RAIL

Over-Dimension Road & Rail

  • Low-bed and modular trailers
  • Route surveys and permits arranged
  • Escort support where required
  • Special rail wagons for long pieces
RELOCATION

Plant Relocation & Restart

  • Factory-to-factory moves
  • Dismantling & installation coordination
  • Production-restart logistics
  • Multimodal project plans
Multimodal transport solution
24/7 project control desk monitoring shipments
One Phone Number for the Whole Project 整个项目,只找一个人

How We Manage

One Named Project Team, 24/7

  • Single Point of Accountability

    One project manager and one plan coordinate the airline, shipping line, stevedores, crane and trucking teams.

  • Method Statement & Risk Review

    Written method statement, risk assessment and contingency plan agreed before execution begins.

  • Vendor Coordination

    Surveyors, crane and rigging crews and specialized hauliers booked against one critical-path schedule.

  • Milestone Reporting

    Photo and status reports at every milestone — issues are raised early, with options attached.

  • Insurance Arranged

    Cargo insurance placed per the Institute Cargo Clauses on request, matched to the project value.

The Standards We Work By

Engineered Against the Rules That Apply

Project cargo crosses mode-specific regulators — the securing, permits and dangerous-goods paperwork are built around each leg before loading.

Compliance statement

Aircraft charters and vessel space are arranged on demand with airlines and shipping lines — CSI does not own aircraft, vessels, cranes or trucks. Lifting, road haulage and terminal work are performed by qualified contractors; CSI acts as the booking forwarder and project logistics coordinator, responsible for the plan, bookings, documents and supervision. Dangerous-goods acceptance is subject to the airline, carrier and route rules and confirmed case by case.

IMO CSS CODE

Code of Safe Practice for Cargo Stowage & Securing

The reference for lashing, choking and securing non-standard cargo on board vessels.

Securing plan aligned
OVER-DIMENSION

Over-Size & Over-Weight Road Permits

Route surveys and over-dimension transport permits arranged with the authorities before departure.

Permit arranged
IATA DGR

Dangerous Goods Regulations by Air

DG and lithium-battery shipments prepared under IATA DGR, subject to airline acceptance on the route.

Accepted case by case
IMDG CODE

Dangerous Goods by Sea

Sea DG cargo declared, packed and stowed under the IMDG Code, with class and routing confirmed in advance.

Class confirmed
INCOTERMS 2020

Delivery Terms on Every Quote

Responsibility, risk and cost allocation — EXW to DDP — confirmed in writing before booking.

Per shipment confirmed
ICC INSURANCE

Institute Cargo Clauses

Cargo insurance arranged per Institute Cargo Clauses (A/B/C) on request, matched to declared value.

Arranged on request

On Site

Breakbulk Decks, Crane Pads and Low-Beds

Wind-energy tower sections loaded as breakbulk by quay cranes
BreakbulkWind-energy tower sections loaded by crane
Tandem mobile-crane lift of heavy steel sections
Heavy liftTandem lift planned to the method statement
Oversize load secured on a low-bed trailer
Over-dimension roadOversize load secured for the road leg

Have an Out-of-Gauge or Time-Critical Project?

Send the cargo drawings, dimensions and weight, the two sites and your target date — a routing and execution plan comes back fast.

WhatsApp E-Mail
WeChat
CSI Trans WeChat QR code

Scan to chat on WeChat